CREATOR 1 LLCSpecialty Solutions for Common Failures
DOC: C1-MF-100-DSRequest a quote
C1-MF-100Built to order. Design completeInstalls in parallel

Transformer running hot, and the replacement years out? Make the one you have last.

Patent pending: US 19/738,513

Load grows, harmonics from drives, inverters and server power supplies stack on top, and the hotspot climbs. You derate, shed load, or order a replacement that costs seven figures installed, and the delivery date keeps moving. If the old unit fails before the new one shows up, you pay for a mobile unit, overtime and an outage you cannot schedule.

Everyone is trying to monitor the transformer better, or get a better place in the transformer line.

We change the loss, not the transformer. ModFormer installs in parallel and puts energy that is burned off as heat today back to work. Less heat, slower aging, a unit that lasts until its replacement arrives. Remove it and you are back to normal operation.
PART NO: C1-MF-100SCALE: NTS
CONVENTIONAL: LOSSES ARE FIXED(MEASURED, THEN ENDURED)TRANSFORMERI²R + EDDY + BACK-EMFLOSS AS HEATHARMONICSDOWNSTREAMHOTSPOT RISES, INSULATION AGES,DERATE OR REPLACEC1-MF-100: GOVERNED LOSS, IN PARALLEL(TRANSFORMER NOT OPENED OR REWOUND)EXISTING TRANSFORMERUNCHANGEDMODFORMERENERGY RETURNEDREMOVE IT,BACK TO NORMALRESULT: LOSS GOVERNED, TRANSFORMER UNTOUCHED
PROJ: SCHEMATICREV: A

The physics, in one minute

First-principles electrical basis
01 / Loss is heat

Harmonics hit harder than their size.

Eddy loss under harmonic load (IEEE C57.110):PEC ∝ Σ Ih² · h²

Winding eddy loss grows with the square of harmonic order. A modest 5th and 7th harmonic content can add far more heat than the RMS current suggests. That heat is what drives the hotspot.

02 / Wasted energy

A collapsing field carries energy.

Energy stored in the field:E = ½ L I²

Every time a magnetic field collapses, that stored energy has to go somewhere. Conventional designs suppress it or burn it off as heat. Put it back to work and the same job runs with less loss. Same energy in, less of it wasted.

03 / Insulation aging

Degrees are years.

Aging acceleration (IEEE C57.91):FAA = e15000/383 − 15000/(θH+273)

Insulation life falls off exponentially with hotspot temperature. Roughly every 6 to 7 °C off the hotspot halves the aging rate. Take loss out and the transformer lives longer without a rewind.

What transformer losses and waiting cost you

Your numbers, your tool
Losses, replacements and waiting per year
units × kW loss × 8,760 h × $/kWh + replacements × cost + units waiting × 12 × temporary cost$0

Defaults are placeholders. Put in your own figures. This is the loss, replacement and waiting spend ModFormer goes after. Bring the number to the fit review. See modeled loss on live grid nodes at kvolt.io.

What we offer for your fleet

Stage-gated engineering delivery
STAGE 01No charge

1. Fit review

You send your transformer ratings, load profiles, harmonic sources and the temperatures you see. We tell you whether it fits. No charge, under mutual NDA.

STAGE 02Credited fee

2. Phase 0 feasibility

Fixed fee. We model your units against your load profiles under IEEE C57.91 and size the module. You get an installation plan and a firm quote. The fee is credited to your order.

STAGE 03Milestone PO

3. Phase 1 qualification unit

We build a unit for your transformer. You set the acceptance test. Payment at milestones, not up front.

STAGE 04Supply / license

4. Production

Supply for your fleet, or a field-of-use license if you build it yourself.

Assurances and protection

Commercial & IP governance

How we protect you

Buyer safeguards
  • Mutual NDA before you share fleet and load data.
  • Your data is used only for your fit, never published.
  • You set the acceptance criteria for your unit.
  • No payment until a purchase order, then at milestones.
  • Your protection settings and relay coordination stay as they are.

How we protect ourselves

IP & design control
  • US nonprovisional patent application on file.
  • Design detail is released only under a signed agreement, after Phase 0.
  • The design remains ours. You buy units or license the right to build.

Where it stands

Program status & configuration parameters
ParameterCurrent status / specification
Patent statusPatent pending. US nonprovisional application 19/738,513, claiming priority to a provisional filed 12 Jul 2025.
ReadinessBuilt to order. Design complete. Schematics and fab-ready board files complete; modeled against IEEE C57.91. Custom built to your units; your qualification unit is the first build.
ArchitectureRuns on our timing firmware and dedicated hardware.
FitsOil-immersed distribution transformers: industrial, data center, solar integration and utility fleets.
InstallIn parallel with the existing transformer. Not opened, not rewound. Remove it and you are back to normal operation.
ProtectionRelay settings, fuse coordination and protection schemes unchanged.

Request a quote

Part: C1-MF-100  |  Direct engineering intake

Your email program opens with this request addressed to quotes@crea8or1.com. Nothing is billed until a purchase order.

Related failures we solve

C1-MF-300Inverter failures on battery and solar systems (C1-MF-300)→C1-MF-400Switching energy burned off in drives and solenoids (C1-MF-400)→C1-MF-500Voltage sag under swinging loads (C1-MF-500)→