CREATOR 1 LLCSpecialty Solutions for Common Failures
DOC: C1-MF-400-DSRequest a quote
C1-MF-400Built to order. Design completePuts wasted energy back to work

Burning off switching energy as heat? Put it back to work.

Patent pending: US 19/738,513

Every time a motor, contactor, relay or solenoid switches off, the energy in its coil gets dumped into a snubber, a clamp or a brake resistor. The cabinet runs hot, you add fans and bigger heat sinks, and the snubber parts are the ones you replace. On a busy machine that happens hundreds of times a second.

Everyone is trying to get rid of the heat faster.

We stop making the heat. ModFormer captures the energy stored in the coil at turn-off and puts it back on your supply, instead of burning it off. Same energy in, less of it wasted.
PART NO: C1-MF-400SCALE: NTS
COILSNUBBER ORBRAKE RESISTORHEATSTORED ENERGY BURNED EVERY TURN-OFFCOILC1-MF-400RECOVERYBUSCONVENTIONAL: CLAMP AND BURN(SNUBBER, CLAMP OR BRAKE RESISTOR)C1-MF-400: CAPTURE AND RETURN(SAME LOAD, SAME SWITCHING)RESULT: LESS HEAT, ENERGY BACK ON THE BUS
PROJ: SCHEMATICREV: A

The physics, in one minute

First-principles electrical basis
01 / Stored energy

A coil holds energy.

Energy in the field at turn-off:E = ½ L I²

A 10 mH coil carrying 20 A holds 2 J. That is small once and large when it repeats. All of it leaves the coil at turn-off.

02 / It repeats

Energy times rate is power.

Average power burned off:P = ½ L I² · f

The same 2 J at 100 turn-offs a second is 200 W of heat in the cabinet, every hour the machine runs. That is the number the module goes after.

03 / Heat ages parts

Every 10 °C counts.

Arrhenius rule of thumb for components:life ∝ 2−ΔT/10

Capacitors and semiconductors lose roughly half their life for every 10 °C hotter they run. Take the heat source out and the cabinet parts last longer.

What switching heat costs you

Your numbers, your tool
Energy burned off per year
units × ½ L I² × turn-offs/s × hours × $/kWh$0

Defaults are placeholders. Put in your own figures. This counts energy only; cooling and snubber part replacement come on top. Bring the number to the fit review.

What we offer for your machines

Stage-gated engineering delivery
STAGE 01No charge

1. Fit review

You send the load, coil ratings, switching rate and how the energy is clamped today. We tell you whether it fits. No charge, under mutual NDA.

STAGE 02Credited fee

2. Phase 0 feasibility

Fixed fee. We model your load and switching and size the module. You get an installation plan and a firm quote. The fee is credited to your order.

STAGE 03Milestone PO

3. Phase 1 qualification unit

We build a unit for your machine. You set the acceptance test. Payment at milestones, not up front.

STAGE 04Supply / license

4. Production

Supply for your fleet, or a field-of-use license if you build it yourself.

Assurances and protection

Commercial & IP governance

How we protect you

Buyer safeguards
  • Mutual NDA before you share drive and machine data.
  • Your data is used only for your fit, never published.
  • You set the acceptance criteria for your unit.
  • No payment until a purchase order, then at milestones.
  • Your drive, contactor and protection settings stay as they are.

How we protect ourselves

IP & design control
  • US nonprovisional patent application on file.
  • Design detail is released only under a signed agreement, after Phase 0.
  • The design remains ours. You buy units or license the right to build.

Where it stands

Program status & configuration parameters
ParameterCurrent status / specification
Patent statusPatent pending. US nonprovisional application 19/738,513, claiming priority to a provisional filed 12 Jul 2025.
ReadinessBuilt to order. Design complete. Custom built to your system; your qualification unit is the first build.
FitsMotor drives, contactor and relay banks, solenoid valves and actuators, braking circuits.
ResultEnergy stored at turn-off returned to the supply instead of burned off as heat.
ProtectionYour existing protection unchanged.

Request a quote

Part: C1-MF-400  |  Direct engineering intake

Your email program opens with this request addressed to quotes@crea8or1.com. Nothing is billed until a purchase order.

Related failures we solve

C1-MF-100Transformer overheating, harmonic losses and lead times (C1-MF-100)→C1-MF-300Inverter failures on battery and solar systems (C1-MF-300)→