CREATOR 1 LLCSpecialty Solutions for Common Failures
DOC: C1-MF-300-DSRequest a quote
C1-MF-300Built to order. Design completeNo inverter bridge

Inverter keeps failing? Get AC without one.

Patent pending: US 19/738,513

The panels are fine, the batteries are fine, and the site is down because the inverter quit again. It runs hot, its fans clog, its capacitors age, and the replacement is a truck roll and a week of lost output. Across a fleet, inverter swaps are a line item you plan for every year.

Everyone is trying to build a more reliable inverter.

We take the inverter bridge out of the path. ModFormer builds the AC waveform in the coil itself, so the part that fails first is not there to fail.
PART NO: C1-MF-300SCALE: NTS
DC SOURCEINVERTER BRIDGESWITCHING HEATAC LOADTHE PART THAT FAILS FIRSTDC SOURCEC1-MF-300AC BUILT IN THE COILAC LOADCONVENTIONAL: DC CHOPPED INTO AC(FAST SWITCHES, HEAT, CAPACITORS)C1-MF-300: AC SHAPED IN THE COIL(NO INVERTER BRIDGE, NO DAC)RESULT: FEWER PARTS IN THE PATH TO FAIL
PROJ: SCHEMATICREV: A

The physics, in one minute

First-principles electrical basis
01 / Switching heat

Every edge costs energy.

Switching loss per device:Psw ≈ ½ V I (tr + tf) fsw

An inverter bridge switches thousands of times a second, and each transition dissipates energy. That heat is why inverters need fans and heat sinks, and why they age.

02 / Parts in series

The chain is as strong as its weakest link.

Series system failure rate:λsys = Σ λi    R(t) = e−λsys t

Every switch, driver, capacitor and fan in the power path adds to the failure rate. Take the bridge out of the path and its share of the failures goes with it.

03 / Clean output

Power quality is the test.

Voltage distortion limit (IEEE 519, at or below 1 kV):THDV ≤ 8%   individual ≤ 5%

The output has to stay within harmonic limits at your point of connection. The design is sized against IEEE 519 for your load at Phase 0.

What inverters cost you

Your numbers, your tool
Inverter replacements and conversion loss per year
systems × (replacement cost / life + kWh × loss % × $/kWh)$0

Defaults are placeholders. Put in your own figures. This is the replacement and conversion-loss spend an inverter-free path goes after. Bring the number to the fit review.

What we offer for your systems

Stage-gated engineering delivery
STAGE 01No charge

1. Fit review

You send the DC source, the AC load, power level and where the systems are installed. We tell you whether it fits. No charge, under mutual NDA.

STAGE 02Credited fee

2. Phase 0 feasibility

Fixed fee. We model your source and load and size the unit against IEEE 519 at your connection. You get an installation plan and a firm quote. The fee is credited to your order.

STAGE 03Milestone PO

3. Phase 1 qualification unit

We build a unit for your system. You set the acceptance test. Payment at milestones, not up front.

STAGE 04Supply / license

4. Production

Supply for your fleet, or a field-of-use license if you build it yourself.

Assurances and protection

Commercial & IP governance

How we protect you

Buyer safeguards
  • Mutual NDA before you share system data.
  • Your data is used only for your fit, never published.
  • You set the acceptance criteria for your unit.
  • No payment until a purchase order, then at milestones.
  • Your protection and disconnects stay as they are.

How we protect ourselves

IP & design control
  • US nonprovisional patent application on file.
  • Design detail is released only under a signed agreement, after Phase 0.
  • The design remains ours. You buy units or license the right to build.

Where it stands

Program status & configuration parameters
ParameterCurrent status / specification
Patent statusPatent pending. US nonprovisional application 19/738,513, claiming priority to a provisional filed 12 Jul 2025.
ReadinessBuilt to order. Design complete. Custom built to your system; your qualification unit is the first build.
FitsSolar, battery storage, backup power, telecom and remote sites, mobile power.
PathDC in, AC out, no inverter bridge and no DAC in the power path.
ProtectionYour breakers, disconnects and grounding unchanged.

Request a quote

Part: C1-MF-300  |  Direct engineering intake

Your email program opens with this request addressed to quotes@crea8or1.com. Nothing is billed until a purchase order.

Related failures we solve

C1-MF-100Transformer overheating, harmonic losses and lead times (C1-MF-100)→