CREATOR 1 LLCSpecialty Solutions for Common Failures
DOC: C1-MF-500-DSRequest a quote
C1-MF-500Built to order. Design completeNo moving contacts

Voltage sags every time the big load swings? Regulate as fast as it moves.

Patent pending: US 19/738,513

The crane lifts, the welder strikes, the chargers all start at shift change, and the voltage drops. Drives trip, controllers reset, lights flicker and the line stops. The tap changer or regulator chases it a step at a time, seconds behind, and racks up operations until its contacts need service.

Everyone is trying to make the tap changer faster or tougher.

We change the ratio with the load, not after it. ModFormer adjusts its turns ratio during operation with no mechanical contacts, so the voltage holds through the swing.
PART NO: C1-MF-500SCALE: NTS
+10%−10%SAG: DRIVES TRIPTAP CHANGER STILL MOVINGRATIO FOLLOWS THE LOAD, NO MOVING CONTACTSCONVENTIONAL: STEP AFTER THE SAG(MECHANICAL TAP CHANGER)C1-MF-500: RATIO DURING OPERATION(NO MOVING CONTACTS)RESULT: VOLTAGE HELD THROUGH THE LOAD SWING
PROJ: SCHEMATICREV: A

The physics, in one minute

First-principles electrical basis
01 / Why it sags

Current through impedance.

Voltage drop on a feeder:ΔV ≈ (R · P + X · Q) / V

Large motor starts pull reactive current, and X times Q dominates the drop. The bigger and faster the load swing, the deeper and sharper the sag.

02 / Too slow

A step takes seconds.

Conventional step regulator:±10% in 32 steps of 0.625%

A mechanical regulator moves one step at a time after a time delay. A motor start is over in a fraction of that. The sag happens before the first step lands.

03 / Wear by operation

Every step is a contact event.

Maintenance is counted in operations:contact wear ∝ operations × current switched

Swinging loads drive thousands of tap operations a year. Each one arcs and wears the contacts. A ratio change with no moving contacts has no contact count to service.

What voltage sags cost you

Your numbers, your tool
Sag trips and tap changer service per year
trips × cost per trip + services × cost per service$0

Defaults are placeholders. Put in your own figures. This is the trip and maintenance spend a contact-free regulator goes after. Bring the number to the fit review.

What we offer for your site

Stage-gated engineering delivery
STAGE 01No charge

1. Fit review

You send the feed, the swinging loads and the voltage events you record. We tell you whether it fits. No charge, under mutual NDA.

STAGE 02Credited fee

2. Phase 0 feasibility

Fixed fee. We model your feed and load swings and size the regulator. You get an installation plan and a firm quote. The fee is credited to your order.

STAGE 03Milestone PO

3. Phase 1 qualification unit

We build a unit for your feed. You set the acceptance test. Payment at milestones, not up front.

STAGE 04Supply / license

4. Production

Supply for your fleet, or a field-of-use license if you build it yourself.

Assurances and protection

Commercial & IP governance

How we protect you

Buyer safeguards
  • Mutual NDA before you share one-lines and power quality data.
  • Your data is used only for your fit, never published.
  • You set the acceptance criteria for your unit.
  • No payment until a purchase order, then at milestones.
  • Your protection and relay settings stay as they are.

How we protect ourselves

IP & design control
  • US nonprovisional patent application on file.
  • Design detail is released only under a signed agreement, after Phase 0.
  • The design remains ours. You buy units or license the right to build.

Where it stands

Program status & configuration parameters
ParameterCurrent status / specification
Patent statusPatent pending. US nonprovisional application 19/738,513, claiming priority to a provisional filed 12 Jul 2025.
ReadinessBuilt to order. Design complete. Custom built to your system; your qualification unit is the first build.
FitsSites with welders, cranes, large motor starts, EV charger banks, or long rural feeders.
RegulationTurns ratio changed during operation. No mechanical tap changer contacts.
ProtectionRelay settings and protection schemes unchanged.

Request a quote

Part: C1-MF-500  |  Direct engineering intake

Your email program opens with this request addressed to quotes@crea8or1.com. Nothing is billed until a purchase order.

Related failures we solve

C1-MF-100Transformer overheating, harmonic losses and lead times (C1-MF-100)→