CREATOR 1 LLCSpecialty Solutions for Common Failures
DOC: C1-CRYO-100-DSRequest a quote
C1-CRYO-100TRL 3: design completeSwapped at PM

ESC refurbishment downtime? Swap a cassette, not the stage.

Patent pending: US 64/147,989 and 64/151,602

Your chuck runs fine until it doesn't. Helium leak-up creeps, cooldown slows, wafer temperature uniformity walks off. Then the stage comes out: vent, pull the assembly, ship it for refurbishment or swap in a spare from the pool, reinstall, leak check, pump down, season, requal. Days of tool time, and a spare pool tying up capital just so the tool can run while the other unit is away.

Everyone is trying to make the chuck last longer between refurbs.

We moved the thermal wear into a hand-portable cassette. It swaps at PM without disturbing the stage's processing face, and its life follows real wear, not the calendar.
DWG NO: C1-CRYO-100-ASCALE: NTS
CONVENTIONAL: WEAR BUILT INTO THE STAGE(WHOLE ASSEMBLY OUT FOR REFURB)PROCESSING FACESTAGE + WORN THERMAL PATHOFF-SITEREFURBVENT, PULL, SHIP, REINSTALL, LEAK CHECK,SEASON, REQUALC1-CRYO-100: WEAR IN A CASSETTE(HOUSING AND FACE STAY IN PLACE)PROCESSING FACECASSETTENEW CASSETTEHAND-PORTABLEHOUSING STAYS MOUNTEDRESULT: SWAP THE CASSETTE, NOT THE STAGE
PROJ: SCHEMATICREV: A

The physics, in one minute

First-principles thermal & mechanical basis
01 / Contact wear

Worn contact shows up as temperature.

Temperature rise across a contact:ΔT = Q / (hc · A)

Every thermal interface that cycles loses contact conductance as its surfaces wear. At the same heat load, a lower hc means a bigger temperature step, and the wafer runs warmer. The wear is unavoidable. Where it lives is a design choice. We put it where a technician can reach it.

02 / Availability

Downtime is set by the repair, not the failure.

Inherent availability:A = MTBF / (MTBF + MTTR)

You can push MTBF up a little with better materials. Cutting MTTR from a stage pull and refurbishment to a cassette swap moves availability much further, on every chamber, every PM.

03 / Reference surfaces

Leave the datum alone.

The cassette comes out without disturbing the housing, the processing face or its alignment surfaces. What you re-verify after a swap is the thermal path, not the whole stage.

What stage refurbishment costs you

Your numbers, your tool
Refurbishment cost per year
(hours down × cost per hour + refurb cost) × events × chambers$0

Defaults are placeholders. Put in your own figures. This is the cost a cassette swap at PM is meant to take off your books. Bring the number to the fit review.

What we offer for your stage

Stage-gated engineering delivery
STAGE 01No charge

1. Fit review

You send your chamber, stage type, refurbishment interval, heat load and target temperature. We tell you whether it fits. No charge, under mutual NDA.

STAGE 02Credited fee

2. Phase 0 feasibility

Fixed fee. We run the thermal budget against your heat load and cold source and fit the envelope to your chamber. You get a written go or no-go. The fee is credited toward your qualification unit.

STAGE 03Milestone PO

3. Phase 1 qualification unit

We build a unit for your tool. You set the acceptance test. Payment at milestones, not up front.

STAGE 04Supply / license

4. Production

Supply for your fleet, or a field-of-use license if you build it yourself.

Assurances and protection

Commercial & IP governance

How we protect you

Buyer safeguards
  • Mutual NDA before you share chamber data.
  • Your data is used only for your fit, never published.
  • You set the acceptance criteria for your unit.
  • No payment until a purchase order, then at milestones.

How we protect ourselves

IP & design control
  • Two US patent applications on file.
  • Design detail is released only under a signed agreement, after Phase 0.
  • The design remains ours. You buy units or license the right to build.

Where it stands

Program status & configuration parameters
ParameterCurrent status / specification
Patent statusPatent pending. US provisional applications 64/147,989 (filed 4 Sep 2026) and 64/151,602 (filed 9 Sep 2026).
ReadinessTRL 3. Design complete; cassette drawings released. Qualification hardware is the next step.
FitsCooled wafer stages in plasma etch and deposition. Built into the C1-CRYO-200 stage; retrofit review for other cooled stages.
ServiceHand-portable. Swapped at PM; housing and processing face stay mounted.
LifeFollows observed thermal drift, with the C1-CRYO-300 monitor reporting to your tool controller.

Request a quote

Part: C1-CRYO-100  |  Direct engineering intake

Your email program opens with this request addressed to quotes@crea8or1.com. Nothing is billed until a purchase order.

Related failures we solve

C1-CRYO-200Bellows failure on a cryogenic stage (C1-CRYO-200)→C1-CRYO-300Chuck temperature drift between PMs (C1-CRYO-300)→