CREATOR 1 LLCSpecialty Solutions for Common Failures
DOC: C1-CRYO-200-DSRequest a quote
C1-CRYO-200TRL 3: design and analysis completeBuilt to your chamber

Bellows failure on a cryogenic stage? Stop moving the coolant while you etch.

Patent pending: US 64/147,989 and 64/151,602

Your stage rotates, tilts or translates at -100 °C under vacuum, and the coolant has to follow it through bellows, flex lines or a rotary union. Then a bellows cracks. The chamber goes down unscheduled: vent, wet clean, replace the line, pump down, season, requal. Meanwhile the moving lines shake the payload, and every dynamic seal is one more leak path and outgassing source.

Everyone is trying to build a bellows that survives the motion.

We stopped moving the coolant. The cold source stays still while you etch, and the heat crosses the motion through solid metal.
DWG NO: C1-CRYO-200-ASCALE: NTS
CONVENTIONAL: DYNAMIC COOLANT PATH(MOVING BELLOWS / ROTARY UNION)STAGE (-100 °C)ROTATE / TILTCYCLIC STRAINLEAK / VIBRATION PATHCOOLANT SUPPLYFAILURE MODE: FATIGUE CRACK, UNSCHEDULED VENTC1-CRYO-200: STATIONARY COLD SOURCE+ SOLID-METAL CONDUCTION BRIDGESTAGE (-100 °C)SOLID-METAL BRIDGENO FLUID IN MOTIONSTATIONARY COLD SOURCEFIXED MOUNTRESULT: 0 COOLANT FLEX CYCLES DURING ETCH
PROJ: SCHEMATICREV: A

The physics, in one minute

First-principles thermal & mechanical basis
01 / Mechanical fatigue

A bellows fails as a leak. Ours wears as a scheduled part.

Anything that follows the stage flexes, and flexing metal has a cycle count. The difference is what happens at the end of it. A bellows is a pressure boundary, so when it cracks the chamber vents: unscheduled down, wet clean, requal. Our moving path carries no fluid and holds no pressure. It is designed to stay inside its elastic range, and it is swapped as the C1-CRYO-100 cassette on your PM schedule, before it is spent. Nothing leaks and nothing vents.

02 / Solid conduction

Heat moves through solid metal by conduction.

Fourier's law:Q = k · A · ΔT / L

Heat flow depends on the metal's conductivity, its cross-section, the temperature difference and the path length. None of those terms needs a moving fluid. Size the path for your heat load and the stage stays cold without coolant crossing the motion.

03 / Vacuum integrity

No moving fluid, no fluid problems.

With no coolant in motion there is no fluid-borne vibration on the stage, and no dynamic vacuum seal to leak, wear, shed particles or outgas.

What a bellows failure costs you

Your numbers, your tool
Unscheduled cost per year
(hours down × cost per hour + requal) × failures × tools$0

Defaults are placeholders. Put in your own figures. This is the cost a scheduled cassette swap at PM is meant to take off your books. Bring the number to the fit review.

What we offer for your stage

Stage-gated engineering delivery
STAGE 01No charge

1. Fit review

You send your chamber, motion range, heat load, target temperature and cold source. We tell you whether it fits. No charge, under mutual NDA.

STAGE 02Credited fee

2. Phase 0 feasibility

Fixed fee. We run the thermal budget against your heat load and cold source and fit the envelope to your chamber. You get a written go or no-go. The fee is credited toward your qualification unit.

STAGE 03Milestone PO

3. Phase 1 qualification unit

We build a unit for your tool. You set the acceptance test. Payment at milestones, not up front.

STAGE 04Supply / license

4. Production

Supply for your fleet, or a field-of-use license if you build it yourself.

Assurances and protection

Commercial & IP governance

How we protect you

Buyer safeguards
  • Mutual NDA before you share chamber data.
  • Your data is used only for your fit, never published.
  • You set the acceptance criteria for your unit.
  • No payment until a purchase order, then at milestones.

How we protect ourselves

IP & design control
  • Two US patent applications on file.
  • Design detail is released only under a signed agreement, after Phase 0.
  • The design remains ours. You buy units or license the right to build.

Where it stands

Program status & configuration parameters
ParameterCurrent status / specification
Patent statusPatent pending. US provisional applications 64/147,989 (filed 4 Sep 2026) and 64/151,602 (filed 9 Sep 2026).
ReadinessTRL 3. Design and thermal analysis complete; stage housing drawings released. Qualification hardware is the next step.
MotionRotation, tilt and linear travel, configured to your stage.
Cold sourceRequirement confirmed at Phase 0 against your heat load.
ServiceWear surface replaced as a cassette swap (C1-CRYO-100), not a chamber teardown.

Request a quote

Part: C1-CRYO-200  |  Direct engineering intake

Your email program opens with this request addressed to quotes@crea8or1.com. Nothing is billed until a purchase order.

Related failures we solve

C1-CRYO-100ESC refurbishment downtime in plasma etch (C1-CRYO-100)→C1-CRYO-300Chuck temperature drift between PMs (C1-CRYO-300)→