CREATOR 1 LLCSpecialty Solutions for Common Failures
DOC: C1-CRYO-300-DSRequest a quote
C1-CRYO-300TRL 2: method definedCondition-based PM

Chuck temperature drift between PMs? Let the stage tell you before the wafer does.

Patent pending: US 64/147,989 and 64/151,602

Etch rate creeps. CD walks. Uniformity maps get worse a little each week. You find it at metrology or in yield, after the lots are already run. So the PM interval gets set by the calendar and padded for the worst chamber: good parts come out early, and fast-wearing ones still drift out between PMs.

Everyone is trying to tighten the PM interval.

We watch the thermal path itself. When the drift trend says the cassette's life is getting shorter, your tool controller hears it before the wafer does.
DWG NO: C1-CRYO-300-ASCALE: NTS
CONVENTIONAL: CALENDAR PM(DRIFT FOUND AFTER THE FACT)SPEC LIMITPMNEXT PMOUT OF SPECFOUND AT METROLOGY, LOTS ALREADY RUNC1-CRYO-300: DRIFT-INDEXED LIFE(TREND PROJECTED, HOST WARNED)SPEC LIMITPMHOST ALERTSWAPPROJECTEDRESULT: SWAP BEFORE THE SPEC LIMIT
PROJ: SCHEMATICREV: A

The physics, in one minute

First-principles thermal & mechanical basis
01 / Thermal resistance

Drift is a resistance change.

Temperature rise along the path:ΔT = Q · Rth

At a steady heat load and a steady cold source, a wafer that runs warmer means thermal resistance went up somewhere in the path. That is wear, and it is measurable long before it is a yield problem.

02 / Trend, not threshold

Project the remaining life.

Time left at the current rate:t ≈ (Rlimit − Rnow) / (dR/dt)

A single alarm limit tells you when you are already out. The slope tells you how long you have. A part that wears faster gets a shorter life, and you see it in advance.

03 / Close the loop

Tell the host first.

The warning goes to your tool controller, so a lot doesn't start on a part about to go out of spec. The wear record stays with the cassette, so its history goes wherever the part goes.

What drift between PMs costs you

Your numbers, your tool
Drift cost per year
(lots × wafers × value per wafer + early pulls) × chambers$0

Defaults are placeholders. Put in your own figures. This is the cost a drift-indexed swap is meant to take off your books. Bring the number to the fit review.

What we offer for your stage

Stage-gated engineering delivery
STAGE 01No charge

1. Fit review

You send your chamber, stage type, PM interval, the drift you see and your tool controller interface. We tell you whether it fits. No charge, under mutual NDA.

STAGE 02Credited fee

2. Phase 0 feasibility

Fixed fee. We run the thermal budget against your heat load and cold source and fit the envelope to your chamber. You get a written go or no-go. The fee is credited toward your qualification unit.

STAGE 03Milestone PO

3. Phase 1 qualification unit

We build a unit for your tool. You set the acceptance test. Payment at milestones, not up front.

STAGE 04Supply / license

4. Production

Supply for your fleet, or a field-of-use license if you build it yourself.

Assurances and protection

Commercial & IP governance

How we protect you

Buyer safeguards
  • Mutual NDA before you share chamber data.
  • Your data is used only for your fit, never published.
  • You set the acceptance criteria for your unit.
  • No payment until a purchase order, then at milestones.

How we protect ourselves

IP & design control
  • Two US patent applications on file.
  • Design detail is released only under a signed agreement, after Phase 0.
  • The design remains ours. You buy units or license the right to build.

Where it stands

Program status & configuration parameters
ParameterCurrent status / specification
Patent statusPatent pending. US provisional applications 64/147,989 (filed 4 Sep 2026) and 64/151,602 (filed 9 Sep 2026).
ReadinessTRL 2. Method defined in the filings. Integration to your stage and controller is specified at Phase 0.
FitsC1-CRYO-200 stages with the C1-CRYO-100 cassette; retrofit review for other cooled stages.
OutputShortened-life warning to your tool controller before the cassette runs out. Interface confirmed at quote.
RecordWear history travels with the cassette.

Request a quote

Part: C1-CRYO-300  |  Direct engineering intake

Your email program opens with this request addressed to quotes@crea8or1.com. Nothing is billed until a purchase order.

Related failures we solve

C1-CRYO-100ESC refurbishment downtime in plasma etch (C1-CRYO-100)→C1-CRYO-200Bellows failure on a cryogenic stage (C1-CRYO-200)→